Weeks 14, 15, and 16

>> Saturday, December 11, 2010

Baby it’s cold outside.  Therefore, it’s cold inside!  

We're missing a lot of insulation and can’t get it back  until the electrical and plumbing are done and pass inspection.  I really think Columbia is competing for the coldest December on record…. of course!

Our builder was kind enough to bring over a propane construction heater.   We  have all learned to love a good propane heater!!

Construction Beta club 001

Dave and Ethan hung about 10 moving blankets from ceiling to floor to block the construction (uninsulated walls) from the rest of the house.   It sure isn’t pretty, but it has helped so much with keeping the warmth in and the cold out.   I’m  pretty sure I won’t be choosing  kelly green paint  for the walls. 

Construction Legend of the Candy Cane 002

Construction 015The kids discovered that they can roast marshmallows inside!

Construction 004

Construction 016

Even Brady has learned where the warm spot is!

Construction 053

What a mess… inside and out, but it’s progress!  Prepping for the front porch.

Construction Beta club 021

They built a 52’ beam to put up for the front of the porch.  It took 4 guys and a truck to get it up!

Construction Beta club 026

Construction Beta club 027Construction Beta club 058Construction Beta club 065Construction Beta club 067Construction Beta club 069Construction Beta club 101

Matthew loves to climb so he  climbed up onto the porch roof and over to the skylight (which is coming out soon!)

construction brady apartment 002

construction brady apartment 014

Another end of the house gets torn apart.   This is Alyssa’s room.   She will gain 6’ in length and 2’ in width and it will look much better from the outside.

construction brady apartment 021construction brady apartment 024

construction brady apartment 035

Construction apartment 002

Construction 048

We’re getting close, or at least closer.   Electrical (started today), plumbing, HVAC, and insulation are next.

0 comments: