Weeks 23, 24, 25, 26, 27, and 28!!!

>> Monday, March 7, 2011

March is here and we’re still up to our ears in house project!!! 

Six weeks have passed since my last post.  Mom and dad’s kitchen is almost finished.    Cabinet doors and drawers, and some touch up paint and it should be done.   All of the tile has been laid and we’re almost done with the grout.  Granite countertops were installed in the kitchen and two bathrooms, lighting and plumbing fixtures are in and the front porch was built.  Carpet comes in two more days then the finishing touches on all of the rooms.     We’ll still be far from done though.  Alyssa’s room is done on the outside of the house, but hasn’t been touched on the inside yet.  Siding and windows need to go on, grading the dirt around the house, and mom and dad’s porch needs to be built.   We’re getting there!

 

Kitchen begins to take shape.

construction bowling 007Tile

construction bowling 041

Countertops, appliances, and fixtures.  All we need now are some cabinet doors.

Daley's Construction 064

Daley's Construction 065My new bedroom – the workshop

construction bowling 011

The old laundry room becomes our new master closet.

Construction etc 033

Front porch!   52 feet long.  I think we’re gonna love it!

Construction Math 001

Construction Math 002

Construction Basketball 006Construction Basketball 003

Granite day

Ethans birthday granite 053

Construction Math 014Ethans birthday granite 065

Temporary stairs off of mom and dad’s bedroom.   These will come off and a screened porch will be added.  Needed to put the stairs on to pass inspection.

Daley's Construction 009Daley's Construction 018

I really liked the character of our front door so I wanted to keep it, but I wanted it to look new like the rest of the house, so I had to strip it.  What a job that turned out to be!!!  A layer of stain followed by three layers of paint, the top layer being oil base.   It became a group effort.  Dave’s sister, Kristen, helped a ton, mom, dad, and Dave all pitched in and we got it done.  Now that it’s down to the bare wood, I’m not sure I want to paint it!!!Daley's Construction 060

Tiling our bathroom shower

Daley's Construction 003

Loving the slate floor in our shower!

Construction 012

Daley's Construction 062

The boys upstairs shower

Matthew's b'day Construction 002

The view from Matthew’s room.  Not too bad, palm trees and the pool. 

Matthew's b'day Construction 005Grout

Matthew's b'day Construction 014

Matthew's b'day Construction 011

Cabinet doors being built today

Construction 002

Construction 004

Our current  master bath is becoming  mom and dad’s bath.  We spent last Saturday gutting it.   Everyone got in on the action, but Dave and dad definitely worked the hardest.  SO much tile to be taken out, but we got it all done.  The bathroom is empty and ready to be made new!

Matthew's b'day Construction 050

Goodbye ridiculously large bath tub!

Matthew's b'day Construction 051Construction Lucy Mae 002

Construction Lucy Mae 004

Ready to not live like this any more.   Tired of not knowing what room I am in….  I think this was once the living room.  Then it became the dining room, now it has the insert from Matthew’s closet with my clothes on it and dressers in it. 

Soon this will all be a memory!

image

0 comments: