Weeks 8, 9, 10, and 11
>> Sunday, November 7, 2010
Oooops, looks like a month has gone by since the last construction update. Things are still moving along. Shingles are on the roof. Upstairs, the walls are studded in three bedrooms, a bathroom and hall way. Front door was removed and pushed out to a temporary spot. Spiral stair case in g.o.n.e, gone! Work has begun on putting in a new (normal) staircase to the 2nd floor. It’s getting a little messy, but it’s progress!!
Shingles… There are old and new in this picture. They match so well, you can’t even tell.
Preparing to move the front door.
Framing the new bathroom in the loft.
Had to remove the old floor boards and insulation. Added new floor joists, replaced the insulation, and put new sub floor down.
Nana checking out the upstairs from the ladder. Right now that’s the only access we have. Hopefully we’ll have stairs this week.
Removing the front door
The spiral stairs on their way out.
He even sweeps!! Tried to convince him he missed some spots in the kitchen, but he didn’t go for it.
Planning the new stairs



0 comments:
Post a Comment